| Activity |
JIRA |
This week |
Detail |
| Visualising the Curriculum Paper Proposal | | 7 | Included preparation and answering questions etc before and after |
| Collections Manager Upgrade | LUC023A-84 | 7 | Work with the library (still not quite there), attempts to move URLs etc, testing individual sites |
| Meetings | | 5 | Lib meeting, Geddes, Lib Committee |
| Admin | | 5 | Pros/cons , keep/leave lists, JIRA, email, LUNA stats, Listen to Lib, skylight release analysis |
| UMIS website set-up | LUC023A-152 | 3 | Basic set up |
| Coimbra links wrong | LUC023A-156 | 1.5 | Includes status report |
| TAD mapping | LIB001-2119 | 1 | Working on architectural ideas |
| Speccoll Archives Space front end | LUC023A-158 | 1 | |
| UTF-8 on Embeds | LUC023A-155 | 1 | Thought this was done- turns out it does not work on everything |
| Hutton data load | LUC656A-242 | 1 | |
| Geddes Autumn work | LUC023A-157 | 0.5 | |
| Server support | | 0.5 | Updating support base |
| lac-store Support | | 0.5 | Carla setup |